Guido Rodríguez and Javi Guerra set the tempo in the midfield
The Argentine was the Valencia CF player who covered the most distance, while the Gilet native made the most recoveries in the match
Valencia CF secured victory against CA Osasuna in front of more than 44,000 Valencianistas who attended Mestalla. In addition to the afternoon’s goal scorer, Ramazani, two other standout performers were Guido Rodríguez and Javi Guerra, who excelled in both the physical and technical-tactical aspects of the match.
On one hand, the Argentine defensive midfielder was the Valencia CF player who covered the greatest distance (10,928m), the third player in the match with the most total actions (69), the leader in opposition attack interruptions (4), and one of the most accurate players in offensive technical-tactical metrics (build-up plus progression), achieving 85% success in total passes, 86% in short-to-medium passes, and 79% in forward passes.
On the other hand, the midfielder from Gilet was the second Valencia CF player in distance covered (10,926m), second in overall involvement in the match (73 actions), and the player with the most recoveries (11). Guerra was also among the most effective players in the technical-tactical category (build-up plus progression), with 82% accuracy in total passes, 90% in short-to-medium passes, and 76% in forward passes.
Latest news Ver todas
Latest news Ver todas
L'INFORMATIU DEL VALENCIA CF - 16/04/26
16 April 2026Valencia CF begins the commercialization of individual Hospitality seats at Nou Mestalla
The Club takes a new step in its strategy with the launch of two new products to elevate the fan experience: Mediterranean Club and Gold Club
L'INFORMATIU DEL VALENCIA CF - 15/04/26
15 April 2026Aritz Aduriz, Javier Arizmendi and Juan Sánchez: three forwards who played for Valencia CF and RCD Mallorca
Review the careers of these three goalscorers
The Nou Mestalla is making progress on the construction of the main roof structure
Work is progressing on the assembly of the roof’s compression and tension rings, key structural elements of the project